Skip to content

303-306-9191

CST-Logo-Color-01
  • Services
  • Case Studies
  • Technologies
  • About Us
Free Consultation

Commercial

Commercial Foundation Repair
Concrete Slab Lifting and Leveling
Increased Load Bearing Capacity
Rocking Slab Stabilization & Undersealing
Soil Densification & Recompaction
Trip Hazard Elimination
Void Fill

Industrial

Carbon Fiber Structural Reinforcement
Grout Curtain Cutoff Wall
Industrial Concrete Lifting & Leveling
Industrial Corrugated Metal Pipe Repair
Industrial Foundation Repair
Tank Equipment & Pad Leveling

Residential

Driveway and Sidewalk Lifting & Leveling
Expansive Clay Soil Treatment
Floor Slab Leveling
Residential Foundation Repair
Swimming Pool and Deck Lifting
Soil Compaction & Void Fill

Transportation

Airport and Taxiway Pavement Lifting & Leveling
Bridge Approach Lifting
Concrete & Asphalt Pavement Lifting
Corrugated Metal Pipe Repair for Transportation Projects
Frost Heave Mitigation
Infiltration Mitigation
Infrastructure and Joint Sealing
Railroad Crossing Void Lift & Slab Fill
Subgrade Soil Stabilization and Densification
Our Engineering Partners
Blog & News
Meet Our Team
Free Consultation
Search
Close this search box.

Case Study

Swimming Pool Void Fill & Soil Stabilization

We filled a pool void, stabilized the soil and restored integrity with cost-effective and reliable solutions.

Project Summary

A water leak at Colorado University's pool caused voids beneath the pool and mechanical room. Our team used expanding structural polymer to fill the voids and strengthen soils weakened by the leak, stabilizing the structure nondestructively in 2 shifts.

The recreation center pool at Colorado University in Boulder, was built in the early 1970’s. When the City water department contacted CU of Boulder concerning a large amount of water usage, an investigation of the pool and it’s drainage system was conducted. The pool’s auto fill feature was shut off, and the pool completely drained, losing 300,000 gallons of water overnight. It was discovered that the pool’s lower drain was damaged, causing the large loss of water.

Mark Young Construction was hired as the general contractor to perform repairs to the drain system. Through ground penetrating radar investigation, large voids were detected beneath the pool and mechanical room that had resulted from the water leak.

Mark Young Construction, a previous customer of CST, was aware of the effectiveness of CST’s polymer technologies and contacted Field Consultant Tom Henkel to provide an estimate and repair design to void fill beneath the pool and mechanical room areas.

Using data first gathered by GPR and then through CST’s own DCP testing and exploratory investigations, voided areas beneath the pool and floor slabs was determined. An injection design was created and CST’s crews installed expanding structural polymer (ESP) through small holes drilled through the pool floor and concrete slabs, filling voids, and strengthening soils weakened by the drain leak. Once void filling was complete, MYC would performed finish work and tile replacement to complete the project.

CST completed all void fill beneath the pool and mechanical room areas. A very small area of slab was also lifted back to elevation to provide stability for future mitigation of settlement.

All of CST’s investigative testing and void filling, and stabilization of the facility was efficiently completed in 2 shifts. The no excavation repair allowed the facility to quickly be put back into use.

The nondestructive nature of CST’s polymer injection technologies effectively stabilize and rehabilitate existing structures, mitigating against future damage and extending their use life without costly tear out and replacement.

About the Project

Location

Boulder, Colorado

Project Date

2018

How We Helped

Swimming Pool Voidfill and Soil Stabilization

Contracting Investor

Mark Young Construction

Project Highlights

Related Services

Airport and Taxiway Pavement Lifting and Leveling

Bridge Approach Lifting

Carbon Fiber Structural Reinforcement

Commercial Foundation Repair

Concrete and Asphalt Pavement Lifting

Concrete Slab Lifting & Leveling

Corrugated Metal Pipe Repair for Transportation Projects

Driveway and Sidewalk Lifting and Leveling

Expansive Clay Soil Treatment

Floor Slab Leveling

Frost Heave Mitigation

Grout Curtain Cutoff Wall

Increased Load Bearing Capacity

Industrial Concrete Lifting & Leveling

Industrial Corrugated Metal Pipe Repair

Industrial Foundation Repair

Infiltration Mitigation

Infrastructure and Joint Sealing

Railroad Crossing Slab Lift and Void Fill

Residential Foundation Repair

Rocking Slab Stabilization and Undersealing

Soil Compaction and Void Fill

Soil Densification & Recompaction

Subgrade Soil Stabilization and Densification

Swimming Pool and Deck Lifting

Tank Equipment & Pad Leveling

Trip Hazard Elimination

Void Fill

Project Gallery

Recommended Case Studies
Buffalo Pool Void Fill[1]
City Swimming Pool Void Fill Soil Stabilization
Read More
Void Fill Soil Stabilization
Irrigation Head Gate Void Fill Erosion Control Soil Stabilization
Read More
CMU Carbon Fiber Repair
Carbon Fiber Structural Repair Exterior Block Wall
Read More
CST Foundation Lift 2017
Foundation Stabilization and Lift
Read More

Concrete Stabilization Technologies, inc.

  • info@cststabilization.com
  • Open Weekdays 9am - 5pm MST
  • 303-306-9191
Get In Touch

INdustries We Serve

  • Commercial
  • Industrial
  • Residential
  • Transportation
  • Commercial
  • Industrial
  • Residential
  • Transportation

How We Help

  • Read Our Case Studies
  • Technologies We Use
  • Read Our Case Studies
  • Technologies We Use

our company

  • Our Team
  • Our Engineering Partners
  • News
  • Careers
  • Our Team
  • Our Engineering Partners
  • News
  • Careers

Areas We Serve

  • Colorado
  • Colorado Springs
  • Denver
  • Utah
  • Salt Lake City
  • Wyoming
  • Montana
  • Colorado
  • Colorado Springs
  • Denver
  • Utah
  • Salt Lake City
  • Wyoming
  • Montana

Concrete Stabilization Technologies, Inc. Ⓒ 2023 | All Rights Are Reserved

Designed and Developed by GEOCMO