Problem
A section of the asphalt roadway on Highway 9 that travels over Hoosier Pass had experienced settlement in the north bound lane and shoulder. Colorado Department of Transportation needed a repair to lift the settled pavement and to strengthen the compromised subgrade soils to mitigate against further settlement and erosion. Closing this section of roadway for a lengthy tear out and replacement of this section of roadway would cause major impediment for the public traveling over this mountain pass. CDOT reached out to CST to investigate the area for an in situ repair option that would not close the roadway.
Solution
CST met with CDOT personnel and did a thorough review of the settled pavement and compromised subgrade areas. Dynamic Cone Penetrometer tests were conducted in the settled areas and data analyzed to determine the weak zones in the subgrade soil. The DCP test data indicated that weak soils existed at –4’ and –8’ in areas beneath the roadway and shoulder of the pavement. An injection layout and target lift elevations was created and CST’s crew injected Expanding Structural Polymer at depth using a 4’-5’ pattern of injections. On the shoulder area, 10’ probes were also set and injections placed at 3 depths to help strengthen and densify soils in this area.
Results
CST successfully completed soil densification and asphalt pavement lifting of this section of roadway. Careful monitoring was completed during injections to lift the settled areas in the roadway to restore and improve the ride over this section of asphalt. All injection work was completed in one working shift and traffic as kept open during the repair. CST’s polyurethane deep injection soil stabilization and lifting methods are ideal for strengthening subgrade soils beneath existing pavement and helping to restore and rehabilitate settled pavement on both asphalt and concrete roadways.