Skip to content

303-306-9191

CST-Logo-Color-01
  • Services
  • Case Studies
  • Technologies
  • About Us
Free Consultation

Commercial

Commercial Foundation Repair
Concrete Slab Lifting and Leveling
Increased Load Bearing Capacity
Rocking Slab Stabilization & Undersealing
Soil Densification & Recompaction
Trip Hazard Elimination
Void Fill

Industrial

Carbon Fiber Structural Reinforcement
Grout Curtain Cutoff Wall
Industrial Concrete Lifting & Leveling
Industrial Corrugated Metal Pipe Repair
Industrial Foundation Repair
Tank Equipment & Pad Leveling

Residential

Driveway and Sidewalk Lifting & Leveling
Expansive Clay Soil Treatment
Floor Slab Leveling
Residential Foundation Repair
Swimming Pool and Deck Lifting
Soil Compaction & Void Fill

Transportation

Airport and Taxiway Pavement Lifting & Leveling
Bridge Approach Lifting
Concrete & Asphalt Pavement Lifting
Corrugated Metal Pipe Repair for Transportation Projects
Frost Heave Mitigation
Infiltration Mitigation
Infrastructure and Joint Sealing
Railroad Crossing Void Lift & Slab Fill
Subgrade Soil Stabilization and Densification
Our Engineering Partners
Blog & News
Meet Our Team
Free Consultation
Search
Close this search box.

Case Study

Middle School Chiller Lift

Our Deep Soil Injection Process restored stability for the chiller’s concrete equipment pads, ensuring functionality before the school year began.

Project Summary

We helped a middle school in Denver avoid damage to its 16-ton ice chiller thermal storage units caused by expansive soil by using high-density polyurethane grouting to stabilize volatile soils and resupport the concrete pads.

A Denver, Colorado, middle school experienced the effects of expansive soil on a pair of large, 16 ton ice chiller thermal storage units used for numerous school refrigeration needs. Each storage unit was placed on independent, 32,000 lb. reinforced concrete pads to maintain a continuous, even elevation for support and proper unit function. Substantial damage and malfunction to each unit was highly probable if the supporting concrete pad was uneven.

Expansive soils shifted beneath the concrete support pads causing an unsatisfactory level for the chiller units to continue functioning. To avoid damage to the units, both were taken out of service until a repair plan was initiated. The concern for the school district was to have the chiller units functioning at capacity, supported on level concrete pads in time for the upcoming school year.

Due to the cost and downtime for the school and potential hazard of damaging each unit through relocation, a choice was made to use a high-density, polyurethane grouting technique. CST’s Deep Injection Process densifies weak soil zones at specified depths to resupport each pad. This process solved three main concerns:

  1. Eliminate relocation of the units
  2. Stabilized volatile soils
  3. Level the units to 3/4” tolerance to restore functionality and capability.

After elevation profiles were taken, injection locations were determined to stabilize weak soil strata and realign the chiller units. Operators injected at depths of 3 feet at an angle to allow greater material coverage for maximum unit stability.

After stabilizing the weakest soil zones, additional injections realigned the pads within the 3/4” tolerance for the ice chillers to function properly without damaging each unit.

About the Project

Location

Denver, Colorado

Project Date

June, 2010

How We Helped

Contracting Investor

Project Highlights

Related Services

Airport and Taxiway Pavement Lifting and Leveling

Bridge Approach Lifting

Carbon Fiber Structural Reinforcement

Commercial Foundation Repair

Concrete and Asphalt Pavement Lifting

Concrete Slab Lifting & Leveling

Corrugated Metal Pipe Repair for Transportation Projects

Driveway and Sidewalk Lifting and Leveling

Expansive Clay Soil Treatment

Floor Slab Leveling

Frost Heave Mitigation

Grout Curtain Cutoff Wall

Increased Load Bearing Capacity

Industrial Concrete Lifting & Leveling

Industrial Corrugated Metal Pipe Repair

Industrial Foundation Repair

Infiltration Mitigation

Infrastructure and Joint Sealing

Railroad Crossing Slab Lift and Void Fill

Residential Foundation Repair

Rocking Slab Stabilization and Undersealing

Soil Compaction and Void Fill

Soil Densification & Recompaction

Subgrade Soil Stabilization and Densification

Swimming Pool and Deck Lifting

Tank Equipment & Pad Leveling

Trip Hazard Elimination

Void Fill

Project Gallery

Recommended Case Studies
Buffalo Pool Void Fill[1]
City Swimming Pool Void Fill Soil Stabilization
Read More
Void Fill Soil Stabilization
Irrigation Head Gate Void Fill Erosion Control Soil Stabilization
Read More
CMU Carbon Fiber Repair
Carbon Fiber Structural Repair Exterior Block Wall
Read More
CST Foundation Lift 2017
Foundation Stabilization and Lift
Read More

Concrete Stabilization Technologies, inc.

  • info@cststabilization.com
  • Open Weekdays 9am - 5pm MST
  • 303-306-9191
Get In Touch

INdustries We Serve

  • Commercial
  • Industrial
  • Residential
  • Transportation
  • Commercial
  • Industrial
  • Residential
  • Transportation

How We Help

  • Read Our Case Studies
  • Technologies We Use
  • Read Our Case Studies
  • Technologies We Use

our company

  • Our Team
  • Our Engineering Partners
  • News
  • Careers
  • Our Team
  • Our Engineering Partners
  • News
  • Careers

Areas We Serve

  • Colorado
  • Colorado Springs
  • Denver
  • Utah
  • Salt Lake City
  • Wyoming
  • Montana
  • Colorado
  • Colorado Springs
  • Denver
  • Utah
  • Salt Lake City
  • Wyoming
  • Montana

Concrete Stabilization Technologies, Inc. Ⓒ 2023 | All Rights Are Reserved

Designed and Developed by GEOCMO