Skip to content

303-306-9191

CST-Logo-Color-01
  • Services
  • Case Studies
  • Technologies
  • About Us
Free Consultation

Commercial

Commercial Foundation Repair
Concrete Slab Lifting and Leveling
Increased Load Bearing Capacity
Rocking Slab Stabilization & Undersealing
Soil Densification & Recompaction
Trip Hazard Elimination
Void Fill

Industrial

Carbon Fiber Structural Reinforcement
Grout Curtain Cutoff Wall
Industrial Concrete Lifting & Leveling
Industrial Corrugated Metal Pipe Repair
Industrial Foundation Repair
Tank Equipment & Pad Leveling

Residential

Driveway and Sidewalk Lifting & Leveling
Expansive Clay Soil Treatment
Floor Slab Leveling
Residential Foundation Repair
Swimming Pool and Deck Lifting
Soil Compaction & Void Fill

Transportation

Airport and Taxiway Pavement Lifting & Leveling
Bridge Approach Lifting
Concrete & Asphalt Pavement Lifting
Corrugated Metal Pipe Repair for Transportation Projects
Frost Heave Mitigation
Infiltration Mitigation
Infrastructure and Joint Sealing
Railroad Crossing Void Lift & Slab Fill
Subgrade Soil Stabilization and Densification
Our Engineering Partners
Blog & News
Meet Our Team
Free Consultation
Search
Close this search box.

Case Study

Cereal Plant Rail Car Soil Stabilization

Our team stabilized soil for rail car access at a cereal plant in Ogden, Utah to ensure secure and safe transport.

Project Summary

Cereal Food Processors in Ogden, Utah had settlement issues around the load-out area for rail cars due to water main leaks. We used our deep injection method to stabilize the affected areas. The repairs were completed in one day, reducing repair costs by 50% compared to reconstruction, and permanently stabilizing the source of the settlement.

The Problem

Undermining and settlement of sub grade soils of railway track and load out canopy area of Cereal Food Processors, Inc. plant, Ogden Utah.

Situation

Concrete Stabilization Technologies, Inc. Field Consultant, Jonathon George was contacted by Scott Roberts of Cereal Foods, Inc. concerning settlement issues around the load out area for rail cars at the cereal processing plant located in Ogden, UT.

Settlement occurred due to a water main leak which had undermined sub grade soils around approximately 120 linear feet of railway track. The area of rail canopy is supported by five pillars. The middle of the five pillars showed the greatest amount of settlement of 1 to ½ inches while the other pillars in both directions had also experienced settlement, but to a lesser degree.

Facts for Consideration

The settled area of the Cereal Food Processor plant is in area used to load rail cars with grain. The area is used on a daily basis with empty rail cars rolling into the canopy area, being loaded with grain, and then moving the heavy load to other areas of the plant for production. This being a vital part of the plant’s production sequence, taking the tracks out of service for an extended period of time, would not only slow production, but affect the plant’s profit margin. Due to the non-invasive process and rapid curing time of CST geopolymers, the track was only out of service for a couple of hours.

Soil test results revealed compromised soil in the settled areas at a depth of three to four feet below the surface grade. No settlement of the tracks themselves had occurred, however, tests performed beneath the tracks did reveal soft soils. As a preventative measure against future settlement in the track area, it was recommended to the owner to treat soils beneath the rail ballast as well.

Solution

Initial soil tests were made in the areas of the canopy pillars and track sub grade. Results of the testing indicated very soft soil three to four feet down into the sub grade area. Penetrometer testing also revealed soft soil beneath the track area as well.

CST’s deep injection method was used to stabilize the affected areas. Repair work began at the center of the east track. 5/8” holes were drilled and probes placed into the sub grade soils. Geopolymer was injected through the probes into the soil on five feet center and four feet below the top of the concrete/asphalt overlay. The purpose of the injections between the tracks was to fill any voids, stabilizing the weak soil, and interlocking the sub grade with the ballast, preventing future settlement.

Once the track area was completed, injections were then made beneath the spread footer of each of the five pillars to stabilize soil and prevent settlement. The two pillars with the most severe settlement were addressed first. Injections were made at depths of one, three, and five feet below the bottom of each spread footer. For the remaining three pillars, injection was made at one and three feet below the bottom of each spread footer. Close monitoring of surface movement at the surface was made during injection, and movement was detected from all injections.

Results

  • 120 Linear Feet of track area sub grade soils successfully stabilized
  • CST successfully stabilized the five supporting canopy pillars in the rail car load out area
  • CST successfully stabilized 120 linear feet of weak soil beneath the rail track area.

Benefits

Time Savings:  Repairs were completed in one day. Track was useable immediately following injection of sub grade soils.
Cost Savings:  Conservatively reduced repair costs by 50% (versus reconstruction).
Longevity:  Repairs permanently stabilized the source of the settlement – weak soils, mitigating future settlement and damage to canopy as well as rail track line through area.

About the Project

Location

Ogden, Utah

Project Date

January 2014

How We Helped

Undermining and settlement of sub grade soils of railway track and load out canopy area of Cereal Food Processors, Inc. plant

Contracting Investor

Cereal Food Processors, Inc.

Project Highlights

Related Services

Airport and Taxiway Pavement Lifting and Leveling

Bridge Approach Lifting

Carbon Fiber Structural Reinforcement

Commercial Foundation Repair

Concrete and Asphalt Pavement Lifting

Concrete Slab Lifting & Leveling

Corrugated Metal Pipe Repair for Transportation Projects

Driveway and Sidewalk Lifting and Leveling

Expansive Clay Soil Treatment

Floor Slab Leveling

Frost Heave Mitigation

Grout Curtain Cutoff Wall

Increased Load Bearing Capacity

Industrial Concrete Lifting & Leveling

Industrial Corrugated Metal Pipe Repair

Industrial Foundation Repair

Infiltration Mitigation

Infrastructure and Joint Sealing

Railroad Crossing Slab Lift and Void Fill

Residential Foundation Repair

Rocking Slab Stabilization and Undersealing

Soil Compaction and Void Fill

Soil Densification & Recompaction

Subgrade Soil Stabilization and Densification

Swimming Pool and Deck Lifting

Tank Equipment & Pad Leveling

Trip Hazard Elimination

Void Fill

Project Gallery

Recommended Case Studies
Buffalo Pool Void Fill[1]
City Swimming Pool Void Fill Soil Stabilization
Read More
Void Fill Soil Stabilization
Irrigation Head Gate Void Fill Erosion Control Soil Stabilization
Read More
CMU Carbon Fiber Repair
Carbon Fiber Structural Repair Exterior Block Wall
Read More
CST Foundation Lift 2017
Foundation Stabilization and Lift
Read More

Concrete Stabilization Technologies, inc.

  • info@cststabilization.com
  • Open Weekdays 9am - 5pm MST
  • 303-306-9191
Get In Touch

INdustries We Serve

  • Commercial
  • Industrial
  • Residential
  • Transportation
  • Commercial
  • Industrial
  • Residential
  • Transportation

How We Help

  • Read Our Case Studies
  • Technologies We Use
  • Read Our Case Studies
  • Technologies We Use

our company

  • Our Team
  • Our Engineering Partners
  • News
  • Careers
  • Our Team
  • Our Engineering Partners
  • News
  • Careers

Areas We Serve

  • Colorado
  • Colorado Springs
  • Denver
  • Utah
  • Salt Lake City
  • Wyoming
  • Montana
  • Colorado
  • Colorado Springs
  • Denver
  • Utah
  • Salt Lake City
  • Wyoming
  • Montana

Concrete Stabilization Technologies, Inc. Ⓒ 2023 | All Rights Are Reserved

Designed and Developed by GEOCMO