Skip to content

303-306-9191

CST-Logo-Color-01
  • Services
  • Case Studies
  • Technologies
  • About Us
Free Consultation

Commercial

Commercial Foundation Repair
Concrete Slab Lifting and Leveling
Increased Load Bearing Capacity
Rocking Slab Stabilization & Undersealing
Soil Densification & Recompaction
Trip Hazard Elimination
Void Fill

Industrial

Carbon Fiber Structural Reinforcement
Grout Curtain Cutoff Wall
Industrial Concrete Lifting & Leveling
Industrial Corrugated Metal Pipe Repair
Industrial Foundation Repair
Tank Equipment & Pad Leveling

Residential

Driveway and Sidewalk Lifting & Leveling
Expansive Clay Soil Treatment
Floor Slab Leveling
Residential Foundation Repair
Swimming Pool and Deck Lifting
Soil Compaction & Void Fill

Transportation

Airport and Taxiway Pavement Lifting & Leveling
Bridge Approach Lifting
Concrete & Asphalt Pavement Lifting
Corrugated Metal Pipe Repair for Transportation Projects
Frost Heave Mitigation
Infiltration Mitigation
Infrastructure and Joint Sealing
Railroad Crossing Void Lift & Slab Fill
Subgrade Soil Stabilization and Densification
Our Engineering Partners
Blog & News
Meet Our Team
Free Consultation
Search
Close this search box.

Case Study

Campbell County Detention Center

We stabilized the foundation of Campbell County Detention Center in Gillette, Wyoming with efficient construction techniques.

Project Summary

We repaired Campbell County Detention Center's foundation with non-intrusive methods, including column stabilization, wall and slab lifting, and soil densification. Completed below estimate, and repairs are still holding strong after more than a decade.

Concrete Stabilization Technologies, Inc., partnered with Campbell County Public Works Department and CEI Engineering, to repair the foundation of the Campbell County Detention Center in Gillette Wyoming during the summer of 2001.

Column Stabilization, Interior Wall Lifting, Floor & Thickened Slab Lifting, Void Fill, and Soil Densification were preformed in the facility to correct a number of settlement issues. Crews began on the outside columns of the building, lifting and stabilizing exterior columns. Using the CST DI process, the soil was stabilized around the columns, voids filled, and columns were placed back on original center. Post testing of the soils in the area proved significant increase in the soil densification, arresting any further settlement issues from occurring. Crews continued work inside the facility, with injections placed to lift and stabilize the floor slabs and lift walls back to grade.

Work performed at the Campbell County Detention Center was done during normal hours of operations, with very minimal disruption to staff or residents of the facility. Security of the residents was not compromised due to the non-intrusive methods and procedures employed by the CST technology. Work was performed in situ, and by utilizing the CST technologies, Campbell County not only saved money by avoiding a rip out and replace scenario, but also avoided the hassle of having to relocate residents and staff. The project was completed on time and below the original estimate. Repairs made to the Campbell County Detention Center over a decade ago, are still holding strong!

About the Project

Location

Gillette, Wyoming

Project Date

2001

How We Helped

Column Stabilization, Interior Wall Lifting, Floor & Thickened Slab Lifting, Void Fill, and Soil Densification were preformed in the facility to correct a number of settlement issues.

Contracting Investor

Campbell County Public Works Department, CEI Engineering

Project Highlights

Related Services

Airport and Taxiway Pavement Lifting and Leveling

Bridge Approach Lifting

Carbon Fiber Structural Reinforcement

Commercial Foundation Repair

Concrete and Asphalt Pavement Lifting

Concrete Slab Lifting & Leveling

Corrugated Metal Pipe Repair for Transportation Projects

Driveway and Sidewalk Lifting and Leveling

Expansive Clay Soil Treatment

Floor Slab Leveling

Frost Heave Mitigation

Grout Curtain Cutoff Wall

Increased Load Bearing Capacity

Industrial Concrete Lifting & Leveling

Industrial Corrugated Metal Pipe Repair

Industrial Foundation Repair

Infiltration Mitigation

Infrastructure and Joint Sealing

Railroad Crossing Slab Lift and Void Fill

Residential Foundation Repair

Rocking Slab Stabilization and Undersealing

Soil Compaction and Void Fill

Soil Densification & Recompaction

Subgrade Soil Stabilization and Densification

Swimming Pool and Deck Lifting

Tank Equipment & Pad Leveling

Trip Hazard Elimination

Void Fill

Project Gallery

Recommended Case Studies
Buffalo Pool Void Fill[1]
City Swimming Pool Void Fill Soil Stabilization
Read More
Void Fill Soil Stabilization
Irrigation Head Gate Void Fill Erosion Control Soil Stabilization
Read More
CMU Carbon Fiber Repair
Carbon Fiber Structural Repair Exterior Block Wall
Read More
CST Foundation Lift 2017
Foundation Stabilization and Lift
Read More

Concrete Stabilization Technologies, inc.

  • info@cststabilization.com
  • Open Weekdays 9am - 5pm MST
  • 303-306-9191
Get In Touch

INdustries We Serve

  • Commercial
  • Industrial
  • Residential
  • Transportation
  • Commercial
  • Industrial
  • Residential
  • Transportation

How We Help

  • Read Our Case Studies
  • Technologies We Use
  • Read Our Case Studies
  • Technologies We Use

our company

  • Our Team
  • Our Engineering Partners
  • News
  • Careers
  • Our Team
  • Our Engineering Partners
  • News
  • Careers

Areas We Serve

  • Colorado
  • Colorado Springs
  • Denver
  • Utah
  • Salt Lake City
  • Wyoming
  • Montana
  • Colorado
  • Colorado Springs
  • Denver
  • Utah
  • Salt Lake City
  • Wyoming
  • Montana

Concrete Stabilization Technologies, Inc. Ⓒ 2023 | All Rights Are Reserved

Designed and Developed by GEOCMO