Problem
This municipal bridge in Parker, Colorado was built in the early 2000s and over time had experienced settlement on both ends at the approach slabs. Water infiltration and two decades of use had contributed to the settlement which was upwards of 3 inches at the worst point, causing a rough ride for the traveling public. The Town had allocated maintenance dollars to rehabilitate the settled bridge approach slabs and was looking for an effective repair to correct the problems and extend the useful life of this existing structure and pavement. The town chose to split the project into two parts. The bridge was located on a busy arterial route that is a connection between Parker and Castle Rock. Traffic needed to be able to continue using the road and bridge without a lengthy closure or large detour.
Solution
The Public Works Engineer reached out to CST to help. The north approach was chosen to complete repairs on first. A thorough investigation and site specific injection layout was created. Profiles of current elevations were taken to establish the amount of lift needed. Deep soil injections of Expanding Structural Polymer (ESP) were made to densify and strengthen the subgrade soil beneath the slabs and to mitigate against water infiltration, erosion, and future settlement. Additional injections were made to lift the approach slab and correct the settlement. Extensive monitoring was conducted during the injection process. One lane of traffic was kept open, in each direction during the repair.
Results
CST successfully lifted the settled approach slab on the north end of this bridge. The lift across the slab ranged from 1/8” at the center to 2 3/4” at the shoulder. Extensive monitoring was done during the lift to ensure proper alignment and correct pavement elevations were achieved. Crews completed all injection and lifting work in 2 shifts. Traffic continued across the bridge and was unobstructed during the repairs. Plans to complete lifting of the south end approach slab have been made for summer of 2025. CST’s polyurethane injection technologies are an ideal and sustainable solution for efficiently and effectively addressing weak soil and settled infrastructure and pavement. We help municipalities stay within their maintenance budgets!