- Herriman, UT
ESP injections stabilized retaining walls with soil densification, halting movement, and lifting settled sections—no excavation needed.
From residential homes to public infrastructure, our team has served a diverse range of clients with uniquely tailored solutions that consistently exceed expectations. Browse our collection of case studies to discover the many different concrete lifting and soil stabilization applications we provide.
ESP injections stabilized retaining walls with soil densification, halting movement, and lifting settled sections—no excavation needed.
CST stopped seepage, filled voids, and stabilized this remote dam with precise polyurethane injection—no excavation needed.
Pavement lift and subgrade stabilization completed in two shifts with no excavation or downtime, preventing further damage.
Building addition stabilized with polyurethane injection, preventing structural failure and costly repairs—completed in one day.
Floor slab lift restored settled school floors in hours—no excavation, no equipment removal, no downtime.
Floor Slab and Flatwork Lift restored stability in hours with ESP injection—zero excavation, minimal disruption.
Box culvert crack and joint seal completed with ESP injections—no excavation needed, fast repairs, and long-term water protection.
CST restored a failing 5′ CMP under CO Hwy 92 in Crawford with no excavation, extending its lifespan while keeping the roadway open.
CST restored a failing 7′ CMP near Akron, CO, with no excavation, extending its lifespan and ensuring proper stormwater flow—saving time and money.
CST lifted and stabilized 47,000+ sq. ft. of floor slab at Cactus Valley Elementary, preventing future settlement with zero-excavation ESP injections.
ESP injections stabilized retaining walls with soil densification, halting movement, and lifting settled sections—no excavation needed.
CST stopped seepage, filled voids, and stabilized this remote dam with precise polyurethane injection—no excavation needed.
Pavement lift and subgrade stabilization completed in two shifts with no excavation or downtime, preventing further damage.
Building addition stabilized with polyurethane injection, preventing structural failure and costly repairs—completed in one day.
Floor slab lift restored settled school floors in hours—no excavation, no equipment removal, no downtime.
Floor Slab and Flatwork Lift restored stability in hours with ESP injection—zero excavation, minimal disruption.
Box culvert crack and joint seal completed with ESP injections—no excavation needed, fast repairs, and long-term water protection.
CST restored a failing 5′ CMP under CO Hwy 92 in Crawford with no excavation, extending its lifespan while keeping the roadway open.
CST restored a failing 7′ CMP near Akron, CO, with no excavation, extending its lifespan and ensuring proper stormwater flow—saving time and money.
CST lifted and stabilized 47,000+ sq. ft. of floor slab at Cactus Valley Elementary, preventing future settlement with zero-excavation ESP injections.